- Place a trash trailer on-site and start the removal of existing siding.
- Inspect all exposed studs and existing insulation to identify any problem areas.
- Conduct a general cleanup and haul all collected debris to the trash trailer.
- Install sheathing over the studs.
- Install a vapor barrier over the sheathing and tape down all windows and doors.
- Install the new siding.
- Paint the new siding and any additional areas contracted.
- Conduct a detailed cleanup and magnet sweep.
- Perform a walkthrough with the customer to identify any loose ends.
- Wrap up all loose ends.
- Request the final payment.